About the Licking County Pipeline
Project Overview
The Licking County Pipeline is a proposed natural gas transmission project in Licking County, Ohio. The pipeline would extend approximately 24 miles and consist of 24-inch steel pipe designed to operate at pressures up to 850 psig.
The line is being developed to power an off-grid data center. It will also be available for future expansion of The Energy Cooperative's distribution system. This behind-the-meter generation is intended to support local economic development while reducing pressure on the regional electric grid.
The pipeline will be buried underground in a dedicated right-of-way and designed for in-line inspection and ongoing monitoring.